Driveways, patios and gardens with the groundwork done right.

Block paving driveways, porcelain and sandstone patios, retaining walls, sleeper beds and turfing in Doncaster. Full dig-out and sub-base on every job, honest from-prices. One person start to finish.

A finished lawn and garden in Sprotbrough, curved edge into the existing block pavingA finished lawn and garden in Sprotbrough, curved edge into the existing block paving
/img/sprotbrough-lawn-finished-3.jpg · 1800×1012

The bit you see is the last ten percent.

A patio or a drive is a groundworks job with a nice surface on top. The surface is what you choose; the groundworks is what you're paying for. Every drive I lay comes out to 250mm and gets 150mm of compacted stone. Every patio sits 150mm below the damp-proof course and falls away from the house. Every porcelain slab is primed and fully bedded. It's not complicated. It's just slower than the way most people do it, and it's why mine stay flat.

Operating the excavator myself changes the price. A landscaping firm hires a machine and a driver for the dig, then brings in the paving lads. I dig it Monday and I'm laying by Wednesday, and there's nobody in between to pay. That's how I can put real prices on this page and still do the job properly.

Drainage is part of every outside job. New hard standing at the front has to drain to your own land, not the road. A patio against the house needs a channel or a gully. If your garden floods now, paving it won't fix that, but a land drain under the new lawn will. I'll design that in from the start rather than bolt it on when the water shows up.

Porcelain going down on a real job, levelling clips in, every slab fully beddedPorcelain going down on a real job, levelling clips in, every slab fully bedded
/img/porcelein-patio-in-progress.jpg · 1200×1500
Recent outside work

Patios, paths and gardens, finished.

Questions
Porcelain, sandstone or block paving: which should I have?

Porcelain for a patio you never want to maintain. Sandstone for a natural look at a lower price. Block paving for drives and paths that take cars. I'll bring samples and I lay all three, so I've no reason to push one.

When should I book?

Spring and summer fill up quickly. A patio for June wants booking by March. Autumn is quieter, the ground's still workable and prices are the same, so it's a good time to have outside work done.

Do you do the whole garden?

Patio, paths, drive, walls, steps, sleeper beds, turf, fencing and gates: yes. Planting and design: I'll level and prepare the beds and you or a garden designer choose the plants.

Will the price change once you start?

Not unless we find something nobody could have known about (a buried tank, an old well, a live cable where it shouldn't be). If that happens I stop, show you, and price it before I carry on.

Credentials

Degree-qualified. Still in the digger.

Most of the people who'll quote you for this work are one or the other: a machine man who's never read a drawing, or a project manager who's never got his hands dirty. I'm both. Here's the story.

  • 5.0 stars on Google6 reviews from real customers
  • Fully insuredPublic liability
  • SMSTS and First AidLegally qualified to run a UK construction site under CDM
  • BSc (Hons) Construction Project Management, First ClassSheffield Hallam University, degree apprenticeship
  • CIOB Certificate of ExcellenceChartered Institute of Building
  • Twelve years on siteUK and Australia, £10m+ delivered as project manager
  • Three full back to brick house renovationsTwo in Scawsby, one in Sprotbrough
  • All aspects of groundworksAnd I operate the plant myself

Get a straight price.

Photos, postcode, rough size. Same-day reply most days.

Call Jack WhatsApp